Your first order proves the product. Your reorder is where the margin lives. Reorders are faster, cheaper and lower-risk than first orders — but only if the factory kept the right records. Here is what "reorder-ready" means in practice, and how pricing and lead time improve as you scale.
Volume changes the maths more than the paperwork — the cost breakdown explains why unit price falls, and AQL inspection covers what has to hold steady.
Why Reorders Are Faster
| Step | First order | Reorder |
|---|---|---|
| Pattern making | 1–3 days (from scratch) | 0 — pattern archived |
| Sampling | 5–7 days | Skipped (approved sample on file) |
| Fabric sourcing | 3–7 days | 1–2 days (spec locked, supplier known) |
| Production | 20–25 days | 15–20 days |
| Total | ~30–35 days | ~18–22 days |
What "Reorder-Ready" Means at the Factory
When your first order finishes, a reorder-ready factory archives four things:
- The digitized pattern — every size graded and stored, ready for the cutting room
- The approved counter-sample — the physical benchmark for workmanship and measurements
- The fabric spec sheet — composition, weight, supplier and dye lot reference for color consistency
- The trim and decoration files — label artwork, embroidery digitizing, print films
Ask any prospective factory whether they provide these on request. If they cannot produce your pattern file in 24 hours, your "reorder" will really be a new first order — same cost, same delays.
How Pricing Improves with Volume
Unit costs drop on reorders for three reasons: fabric at higher volume tiers, amortized setup (cutting markers, embroidery digitizing, printing screens), and line efficiency on familiar styles. The progression for a cotton hoodie: 500 pcs first order → 1,000 pcs (the biggest single drop) → 2,000 pcs (fabric tier pricing) → 5,000+ pcs (essentially flat). Exact tiers depend on fabric and construction, which is why our quotes always show the price ladder by quantity.
Quality Consistency: The Real Risk in Scaling
The danger as volume grows is drift — slightly different fabric lots, slightly relaxed stitching tolerance. The controls that prevent it: fabric inspection against the locked spec, inline checks during cutting and sewing, and a final AQL inspection benchmarked against the archived approved sample. If bulk ever differs from the sample you approved, that archived sample is your proof — another reason it must stay on file.
Our clients typically start small — blanks from 30 pieces or custom runs from 200 — and scale through the reorder program as styles prove out. Curious what your next tier would cost? Send us your current style and quantity — we will quote the full price ladder.
Need the whole range rather than one category? See the full apparel and footwear catalogue — 19 apparel categories and 13 footwear series, with MOQ and lead times for each.
Have a style to produce?
Send your reference, quantity and destination — we reply with a full quote within 24 hours.
Get a Quote Open the catalogue